Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 40 years, born on 2 June 1984

Yekaterinburg, willing to relocate (Yekaterinburg, Moscow, Nizhnevartovsk, Tyumen), prepared for business trips

Project or site manager, Technical support engineer

2 000 $ in hand

Specializations:
  • Sales manager, account manager

Employment: full time

Work schedule: full day

Work experience 23 years 10 months

March 2017currently
8 years 3 months
OOO "ZAPSIBGAZPROM-GAZIFICATION"
Main electrical engineer
- Schedules and planning of works. - Control of installation teams according electrical part of works. - Work of installation and precommissioning for sites of military. - Day to day relationship with the Customer. - Daily, weekly and monthly report to the site manager of the activity and progress. • Managing of Sub-contractors contracts execution (if any).
June 2016March 2017
10 months
OOO "AVA-3"

www.ava3i.com

Project manager
Project management.
November 2013December 2015
2 years 2 months
TOO "Alstom Grid - Rusal Electroengineering"
Site manager
• Organization of site structure to manage the different activities • Follow-up of the detailed site planning in coordination with the erection supervisor and the Commissioning team • Day to day relationship with the Customer • Weekly and monthly report to the Project Manager of the activity and progress. • Local Budget following (Time sheets, Invoices with help of PM,…) • Managing of Sub-contractors contracts execution (if any) • General Environmental Health and Safety (EHS) responsibility
April 2011October 2013
2 years 7 months
TOO "ABB"

www.abb@com

Site manager and sevice engineer
Engineer fitter technical sales support. Project development, device configuration the protection relays of ABB, installation and commissioning. Project and site management, sales management: 1. Schedules and planning of works. 2. Procurement and supply of production facilities - necessary materials. 3. Site management, control of installation teams. 4. Configuration of relay protection ABB. 5. Doing technical documentation of projects. 6. Execution of turnkey projects. 7. Work of commissioning.
January 2009January 2011
2 years 1 month
TOO "RPA"
Commissioning engineer.
1. Schedules and planning of works. 2. Procurement and supply of production facilities - necessary materials. 3. Site management, control of installation teams. 4. Configuration of relay protection SIEMENS. 5. Doing technical documentation projects. 6. Installation, commissioning switchgear 6 - 10 kV, relays 220/110/35/10/6 kV facilities 7. Work of commissioning
January 2008April 2009
1 year 4 months
TOO "SIEMENS"
Design engineer
Participation in the KEGOC company project of modernization protection relay and substation automation and control for bays 1150-500-220-110-35-10 kV. It were implemented Work Designs for following bays during the period: 1. Autotransformer 500/220/10 kV 2. OHL-500 kV 3. Reactor 500-1150 kV 4. Separate CB-500 kV 5. Busbar protection-500 kV 6. Autotransformer 220/110-35/6-10 kV 7. Three windings transformer 220/110-35/6-10 kV 8. Reactor 220 kV 9. Three windings transformer 110/35/6-10 kV 10. Double-wound transformer 110/6-10 kV 11. Bypass CB 220 kV 12. OHL-220 kV 13. Tie/ Bus coupler CB 220kV 14. Bypass CB 110 kV 15. OHL-110 kV 16. Tie/ Bus coupler CB 110kV 17. Voltage transformer 35-500 kV 18. Double-wound transformer 35/6-10 kV 19. Reactor 35-110 kV 20. OHL-35 kV 21. Tie/ Bus coupler CB 35 kV 22. Tie CB 6-10 kV 23. AC&DC supply and central substation signalization
January 2006January 2008
2 years 1 month
TOO "RPA"
Commissioning engineer.
Implementation assembling and debugging works for KEGOC project of modernization protection relay and substation automation and control for bays 1150-500-220-110-35-10 kV: 1. Site management, control of installation teams. 2. Configuration of relay protection SIEMENS. 3. Work of commissioning 4. Installation, commissioning of relay protection facilities 500/220/110/35/10/6 kV.
January 2001January 2006
5 years 1 month
AO “Kazremenergo”
Electrical spesialist
Implementation assembling and debugging works for monitors and analytical laboratories on electrical power station and substation.

Skills

Skill proficiency levels
Деловая коммуникация
Целеустремленность
Умение работать в команде

About me

• Experience in designing, configuring protection relays of ABB. • Practical experience in the field of designing substation secondary circuits and PR&A of grids 6 – 220 kV. • Practical experience in the field of designing reconstruction and modernization of protection relay, substation automation and secondary circuits for substation with existent primary equipment (CB’s, disconnectors, transformer and so on). • Practical experience in the field of implementation assembling and debugging works for digital units SIPROTEC-4. • Knowledge of the design regulations of protection relay, substation automation and secondary circuits for substation 6 – 220 kV. • Knowledge of the practices and Rules of electrical facilities maintenance for PR&A and substation secondary circuits. • Knowledge of requirements DIN and IEC for designing substation secondary circuits and PR&A. • Knowledge of functions and application of digital units SIPROTEC-4. • Knowledge and user’s skills of EPLAN program. • PC: Windows, Office, AutoCAD, Corel, Compass. • Knowledge of English language within the scope of elaboration substation single line diagrams and PR&A drawings and schemes, and reading catalogues of protection and automation devices, relays, switches and other.

Higher education

2006
Almaty Institute of Energy and Telecommunication, Relay Protection and Automation
Electrical power faculty, electrical engineer

Languages

RussianNative


EnglishC1 — Advanced


Professional development, courses

2012
SEP
ABB, technical support engineering and site managment
2008
SIEMENS
SIEMENS, Relay protection training.

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter